Kanu Progress

Weekend update. This weekend saw a good amount of work done on Kanu. Friday was spent sanding, Saturday I re-primed the sanded pieces, then Sunday saw some actual paint work. The red parts got the base coat of Finisher’s Silk Red. The upper piece of the dress still had a good amount of surface defects that I filled using light curing putty on Friday. The part was primed on Saturday, and the base coat was sprayed on Sunday.

kanu1_6_prog 095_jpg.jpg kanu1_6_prog 099_jpg.jpg kanu1_6_prog 121_jpg.jpg

(more…)

Continue ReadingKanu Progress

New Kits from WonFes 2008 Summer

Two kits that I picked up off Y!J auctions arrived Saturday morning. I had just finished re-priming the Kanu kit so having these two kits arrive is just perfect timing. Pulling them out, I get to cutting flash and pinning. The first kit is Asuka Langley from Evangelion cosplaying as Yoko Ritona from Gurren Lagann sculpted by Cherry Blossom. She’s a smaller kit, Cherry Blossom advertises her as 1/7, but seems closer to 1/8 in my eyes. The guide holes placed there by the sculptors greatly help and speed the process of pinning. Here are pictures of the process:

asuka_as_yoko_prog 001_jpg.jpg asuka_as_yoko_prog 002_jpg.jpg asuka_as_yoko_prog 003_jpg.jpg

(more…)

Continue ReadingNew Kits from WonFes 2008 Summer

The most tedious part of model building

Putty, sand, prime, repeat. This is tedious because sanding as a process is tedious. Add in the need to fill seams, fill gaps, fill surface imperfections, sanding on top of that, then primer to check if the fixed areas are truly fixed, the process can repeat itself. And depending on how anal retentive you are, one can spend weeks on the process. Below is a comparison between the initially primed hair and the same part after work was done to clean it up, fix the seam between one of the small hair pieces that came separate; and filling some of the holes caused by the pinning session. There is a small amount of clean up, but the part in the second picture is a leap ahead of the first in terms of surface prep and readiness for paint.

kanu1_6_prog 049_jpg.jpg kanu1_6_prog 087_jpg.jpg

(more…)

Continue ReadingThe most tedious part of model building