Paving and Raising the Water Front
Last week, time was spent applying a pavement texture to the surface of the plastic base. With all the holes filled or covered with plastic the surface was ready.
Last week, time was spent applying a pavement texture to the surface of the plastic base. With all the holes filled or covered with plastic the surface was ready.
Things are progressing alomg. A few changes to positioning and objects here and ther. More changes will continue as the project evolves. Current stage sees the addition of this kotobukia mechanical chain bases. Some cutting, gluing, and filling is at…
The actual title is still in development as is the entire project. Here's the result of last night layout work. Still making adjustments. There are still plenty of add ons and replication (mold and cast pieces). But the major players…
So I’m slowly catching up with technology and going to do quick little pictorial posts now and again in between the more long winded ramblings.