Dom Barrage June Progress Week 4

The week 4 update is here. And so much to go over for a short post. I’ve gone full blown painting now, but there are still some bits and pieces that need clean up and build work. Namely the rear skirt, ammo drum, ammo belt, and gatling gun. But as of this post, everything is almost done with principal painting. But let’s rewind to earlier this week and since the last update. I was still doing minor detail work. The last update introduced some photoetch addon details. Continuing with that, I added some of these detail bits to the knee joint circular covers. I did have to make a slight modification to the part so that the detail bit would sit flush. There are four plastic details that extend slightly towards the center of the round and those needed to be chiseled away. I did a video while I was working on these but I haven’t had the time to edit and upload it. I’m pushing pretty hard on the kit so I’ll probably get that video up once I’m done with the project.

More detailing and getting down with the paint after the jump.

(more…)

Continue ReadingDom Barrage June Progress Week 4

Dom Barrage June Week 3 update

Holy crap, holy crap… I’m finally getting into actual paint that isn’t primer! This is a small update, but only because things are slowing down with the build and I’ve been doing more detail work since the big blocking and building. This post starts with the arms. Looking at the reference pictures, the arms are more boxy than the standard Dom, so I started gluing plastic strips to the arms. Once that cured, I added some putty to fill in gaps and sanded and shaped the part. Then a layer of primer to check the modification. The process for beefing up and squaring up the arm piece is pretty straight forward. Styrene for blocking, putty for gaps and filling in missed areas, then sanding the thing to shape it out.

The arms are pretty plain for now, but the detailing comes next after the jump.

(more…)

Continue ReadingDom Barrage June Week 3 update

Dom Barrage June Week 2 Update

Trying to keep up with the shorter weekly walls of texts. I’ve got some pretty cool things to show for this update so there is a decent amount of meat here. We’ll start off with the front skirts. The back of the front skirts to be exact. In the first picture, this is a picture of the cricut design space software with a back skirt design drawn out. The steps leading to this was first painting the back of the skirts so that I have better contrast when scanning the skirt backs in the all in one printer. The scanned JPG file is then edited in gimp to clean it up and convert it to a transparency PNG file that is then uploaded to the design space software. Once there, it was just a matter of cutting and adding shapes to create the underskirt frame detail.

More after the jump.

(more…)

Continue ReadingDom Barrage June Week 2 Update

Dom Barrage, first week of June 2019 update.

I had a pretty productive weekend for the project. This is mostly cleanup work; but there was a small bit of leg detailing that I didn’t quite complete before my last update. I also want to ramp up the progress since I want to be finished by the end of the month. Who knows if that’ll happen. But goals. I’m going to do shorter walls of text, but try to do weekly updates from here on out. Famous last words.

Returning to the leg, last week I glued in a piece of plastic as a structure base for more bondo. Here I have the bondo added to the back of the legs. I’m also reshaping the back legs to get rid of the small point from the OG Dom’s leg See the last picture in this set for comparison. This meant rescribing the detail line as well as sanding away plastic details that I had already added. This happens when you make mods. You change your mind and have to start erasing or sanding it away only to add it back… it’s all plastic in the end. The putty cured overnight and the legs got sanded. Lines rescribed, and some light curing putty is used to help fill in mistakes here and there. A piece of plastic was cut and scribed(really hard to see until I prime it) but this new plastic piece is the new back leg cover. I filled in the detail marks at the bottom of the legs. Another line is scribed on the inside part of the leg and detail holes were drilled.

More about this weekend’s work after the jump.

(more…)

Continue ReadingDom Barrage, first week of June 2019 update.